EPCI of Ariel Gas Lift Compressors at Afiesere, OML 30
The DBN Project at Afiesere, OML 30 involves the Engineering, Procurement, Construction, and Installation (EPCI) of Ariel Gas Lift Compressors. This project is part of the broader efforts to enhance oil and gas production efficiency in the Niger Delta region.
The compressors, including three Caterpillar G3516B/Ariel JGT2-1 and one Caterpillar 3606/Ariel JGC2-1, are designed to boost gas lift operations, which help in maintaining reservoir pressure and improving oil recovery rates 1.
Project Breakdown
- Engineering: Detailed design and planning of the compressor systems.
- Procurement: Sourcing of necessary equipment and materials.
- Construction: On-site assembly and installation of the compressors.
- Installation: Integration of the compressors into existing infrastructure.
This project aims to optimize gas utilization, reduce flaring, and increase overall production efficiency
Project Outcome
The expected outcomes of the DBN Project – EPCI of Ariel Gas Lift Compressors at Afiesere, OML 30 include:
- Enhanced Oil Recovery: The gas lift compressors will help maintain reservoir pressure, leading to improved oil recovery rates
- Increased Production Efficiency: By optimizing gas utilization, the project aims to increase overall production efficiency.
- Reduced Gas Flaring: The compressors will enable better management of gas resources, significantly reducing gas flaring and its environmental impact.
- Operational Reliability: The installation of high-quality compressors is expected to enhance the reliability and longevity of the gas lift operations
These outcomes collectively contribute to more sustainable and efficient oil and gas production in the Niger Delta region.